 |
The Gamma 6004 Arrived in Two Boxes

|
Box One Contents
(Stand, Tensioner Assembly and Rail, Instruction Manual, Assembly Tools)

|
|
Box Two Contents
(Turntable, Clamps, Racquet Stringing Tools)

|
The Finished Machine After Assembly.
About 1.5 hour's work for me at a leisurely pace (while doing photos).
With a dedicated effort, it could likely be assembled in about 45 minutes.
Front View

|
Back View

|
|
A Slightly Closer View of the Turntable, Tensioner Assembly,
and Tool Tray

|
Turntable Views

|
 |
 |
 |
 |
 |
 |
 |
|
Clamp Bases
(Without Clamps Inserted)

|
 |
 |
|
Clamp Bases, Clamp Heads, Frame Support Slide, and Shoulder Support Views

|
 |
 |
|
Clamp Heads Mounted in Clamp Bases

|
 |
 |
 |
Clamp Heads

|
 |
 |
Clamp Head Close-ups

|
 |
 |
Shoulder Supports

|
 |
|
Shoulder Support Adjustment Knob/Arm and Frame Support Slide

|
 |
Shoulder Support Adjustment Knob

|
 |
Frame Support Slide Adjustment Knob Below Shoulder Support
Adjustment Knob

|
 |
|
Frame Support Post Adjustment Knob

|
 |
 |
|
Tensioner Assembly

|
 |
 |
 |
 |
Tension Adjustment Mechanism

|
 |
 |
String Gripper Assembly

|
 |
 |
String Gripper Jaws/Mechanism

|
 |
 |
 |
|
View from the Tension Track Arm

|
 |
The Tool Tray

|
 |
Tools Included With Gamma 6004
(Set of Nine Hex Wrenches, Pathfinder Awl, Stringer's Awl, Starting Clamp, Bent
Nose Pliers, Needle Nose Pliers, Wire/String Cutters, 10mm Wrench, Badminton
Flying Clamps)

|
Starting Clamp

|
|
Badminton Flying Clamps

|
A Racquet Mounted in the Machine (for "Show")

|
 |
 |
 |
 |
| |
 |
|